Factoryassembly and test facilityPoland
From 10-K · 2025-01-31: We have plans for an additional assembly and test facility in Poland, but have put those plans on hold in conjunction with the delay of the facility in Germany.
FactoryfabsOregon, U.S.
From 10-K · 2026-01-23: Our technology development group, with its R&D, fabs and other manufacturing facilities in Oregon, designs and develops each new process technology node from conception to high-volume production and supports the gradual transition of high-volume production to one of our other high-volume manufacturing sites.
FactoryfacilityGermany
From 10-K · 2025-01-31: We are in the later stages of an expansion of our wafer fabrication facilities in Ireland for our Intel 4 and Intel 3 process nodes and undertaking a significant expansion of our Arizona facility for our upcoming Intel 18A process node.
FactoryNew Mexico advanced manufacturing facilityNew Mexico
From 10-K · 2024-01-26: ■ We announced a commercial agreement with Tower, pursuant to which we are expected to provide foundry services and manufacturing capacity through our New Mexico advanced manufacturing facility for 300mm advanced analog processing.
Factoryother manufacturing facilitiesOregon, U.S.
From 10-K · 2026-01-23: Our technology development group, with its R&D, fabs and other manufacturing facilities in Oregon, designs and develops each new process technology node from conception to high-volume production and supports the gradual transition of high-volume production to one of our other high-volume manufacturing sites.
FactoryR&D and semiconductor fabrication facilitiesOregon
From 10-K · 2025-01-31: Our technology development group, with its R&D and semiconductor fabrication facilities in Oregon, designs and develops each new process technology node before high-volume production is shifted to one of our high-volume manufacturing sites.
Factorywafer fabrication facilitiesIreland
From 10-K · 2025-01-31: We are in the later stages of an expansion of our wafer fabrication facilities in Ireland for our Intel 4 and Intel 3 process nodes and undertaking a significant expansion of our Arizona facility for our upcoming Intel 18A process node.
Factorywafer production facilitiesIsrael
From 10-K · 2025-01-31: We refer to this strategy as "shell ahead.” As a result of the supply shocks driven by the Covid-19 pandemic and the projected growth of our products businesses, we set out to expand our capacity network beyond our existing wafer production facilities in Oregon (mostly utilized for technology development and early production on new nodes), Arizona, Ireland, and Israel to meet this demand and get t
Factorywafer production facilitiesArizona
From 10-K · 2025-01-31: We refer to this strategy as "shell ahead.” As a result of the supply shocks driven by the Covid-19 pandemic and the projected growth of our products businesses, we set out to expand our capacity network beyond our existing wafer production facilities in Oregon (mostly utilized for technology development and early production on new nodes), Arizona, Ireland, and Israel to meet this demand and get t
ResearchR&D facilitiesOregon, U.S.
From 10-K · 2026-01-23: Once a new process technology is developed and achieves high-volume production at our Oregon R&D facilities and fabs, we generally add high-volume manufacturing at one or more of our other production fabs.