Skip to content
Sign in
StableReported 2026-11-20 21:28

Oosaki Denki suspended the production and shipment of smart meters due to a cyber attack.

Oosaki Electric Industry was forced to suspend the production and shipment of smart meters due to the unavailability of its production management system caused by a ransomware attack.

Why it matters. The suspension of smart meter production and shipment may affect the supply chain of the power industry and the monitoring of customer electricity consumption.

01

Who and what it touches

スマートメーターproduces大崎電気工業

From 大崎電気工業

Each line is a relation with evidence behind it, drawn in the direction it points. A line shows that two things are connected, not how far this change reaches.

02

Evidence

  • NNHK business newsMedia2026-11-18 19:51
    View source
  • CCNET JapanMedia2026-11-20 15:15
    View source
  • NNHK general newsMedia2026-11-20 21:28
    View source